Skip to content

PREPARATION FOR EQUIPMENT DELIVERY AND INSTALLATION IS THE RESPONSIBILITY OF THE CUSTOMER

A licensed electrician and a licensed plumber should prepare the site for installation of coffee equipment.

ELECTRICAL INSTALLATION

Customer is responsible to provide:

  • A dedicated circuit and circuit breaker for each coffee machine.
  • Code appropriate wiring for American manufactured 220v machines, 4-wire twist-lock receptacle, line-cord and twist-lock mating plug to match within 36” of machine, and within easy reach of equipment technician and above counter level. see diagrams below.

PLUMBING INSTALLATION

Customer is responsible to provide:

  • Fresh cold water PSI to meet mfg required model specific Specifications.
  • In-coming cold water line within 24” of machine inlet valve, and above counter level
  • Each incoming waterline must be provided with a shut off valve within 24” of the machine inlet valve and above counter level.
  • Back-flow prevention device acceptable to local health / building authorities where required.
  • Model specific machine inlet fitting: check model Specifications for size of inlet fitting to be supplied.
  • Installing technician must be left with a ½” “female” NPT Fitting.

On the sideis an image of typical back-flow prevention devices.

Back to top

Shopping Cart

Your cart is currently empty

Shop now