PREPARATION FOR EQUIPMENT DELIVERY AND INSTALLATION IS THE RESPONSIBILITY OF THE CUSTOMER
A licensed electrician and a licensed plumber should prepare the site for installation of coffee equipment.
ELECTRICAL INSTALLATION
Customer is responsible to provide:
- A dedicated circuit and circuit breaker for each coffee machine.
- Code appropriate wiring for American manufactured 220v machines, 4-wire twist-lock receptacle, line-cord and twist-lock mating plug to match within 36” of machine, and within easy reach of equipment technician and above counter level. see diagrams below.
PLUMBING INSTALLATION
Customer is responsible to provide:
- Fresh cold water PSI to meet mfg required model specific Specifications.
- In-coming cold water line within 24” of machine inlet valve, and above counter level
- Each incoming waterline must be provided with a shut off valve within 24” of the machine inlet valve and above counter level.
- Back-flow prevention device acceptable to local health / building authorities where required.
- Model specific machine inlet fitting: check model Specifications for size of inlet fitting to be supplied.
- Installing technician must be left with a ½” “female” NPT Fitting.
On the sideis an image of typical back-flow prevention devices.